A project to turn 80 per cent of Changzhou’s daily waste into energy has passed the assessment of experts and started commercial operation. The energy generated through burning the waste is being sold on a daily basis to the East China Power Grid. The Rmb400m project, built on a build-operate-transfer (BOT) basis with imported equipment, will be able to handle 270,000 tons of waste each year.