Sample shopping list

Huangshi Port
1. Construction of Qipanzhou New Terminal
Planned capacity: 6.9m tons/year, among them 4m tons of imported bulk (coal, metal ores) and 1.1m tons of exported breakbulk (metal and non metal ores), bulk import 700,000 tons and export 1.1m tons;
Four 3,000 ton/5000 ton bulk cargo berths, three 3000 ton/5000 ton breakbulk berths, one berth for working vessels, and another berth for water supply;
Total budget estimated around Rmb 484m, 35 per cent of which funded by central and local governments;
Ideal partner: taking 65 per cent or more stake, preferably with resources of cargo, technology and management expertise
Shopping list for port handling equipment:
Two abutment cranes (40t-25m)
Ten abutment cranes (10t-25m)
One shiploader (Q=600t/h)
Eight towing vehicles (Q20)
Four towing vehicles (Q=40t)
24 trailers (Q=5t)
Eight trailers (Q=40t)
Two gantries (32t-40m)
Four gantries (10t-40m)
Two bridge gantries (32/5t-28.5m)
Three rubber tyre gantries (QL16)
Four bridge cranes (10t-28.5m)
995 belt conveyers (B=1000mm, v=2.5m/s)
2574 belt conveyers (B=1400mm, v=2.5m/s)
Six mobile belt conveyers (B=1000mm, L=10m)
Five shovel loaders (ZL50)
Two stack reclaimers (DQL400/800-30)
Two automobile scales (Q=60t)


2. Expansion of the Foreign Trade Terminal (Container Terminal)
Scale of project: to build one 3,000dwt/5,000dwt multi-purpose berth with planned annual capacity of 620,000 tons, including 50,000 teu and 200,000 tons of heavy goods; total storage space: 13,492 sq. metres
Estimated cost: Rmb84.6m
Current status: documents to invite bidding have been approved by provincial port authorities;
Ideal partner: foreign funding in the form of joint venture
Shopping list for updating equipment
One 40-ton track multi-purpose gantry
Six container trailers
One 10-ton container stack
Three 3-ton forklifts
Two 25-ton container stackers
One 80-ton automobile scale
3. No 16 Terminal Expansion project
Scale of project: to build three 3,000dwt/5,000dwt berths for bulk and heavy cargo with a total storage space of 29,160 sq. metres; total planned capacity 3m tons; to build a new power exchange, office block, services building, road and warehousing;
Estimated cost: Rmb205m;
Current status: finished feasibility study
Ideal partner: funding and equipment in the form of joint venture
List for updating equipment:
One 40-ton track multi-purpose gantry;
Three 16-ton track multi-purpose gantries;
One shiploader
Three trailers
Three forklifts